Refurbishment of primary AT/MT cabin Tavazzano (LO)
Activity details
The activities were those of remaking the 132KV and 6KV area, through the design of the following
systems:
- New HV 132KV switch
- New TA/TV AT 132KV
- New MV 6KV primary distribution panel
- New energy meter panel
- New stall control panel (TERNA standard)
- New HV/MV Protections Panel
- New prefabricated MV cabin
- Electrical calculations (Load flow, Icc, Selectivity, etc.)
- New Fire Prevention System
- DCS management logic
Activities
Construction engineering activity for the reconstruction of the primary HV/MV cabin of
the transformer of the Central Power Plant./span>
Subject
Tavazzano Electricity Station. The activities were those of reconstruction of the
132KV and 6KV area, through the design of the following systems: