Scope of work

Refurbishment of the 132 kV and 6 kV areas, through the engineering and replacement of the following systems:

  • New 132 kV HV circuit breaker
  • New 132 kV HV CTs / VTs
  • New 6 kV MV switchgear for primary distribution
  • New energy metering switchboard
  • New bay control panel (TERNA standard)
  • New HV/MV protection panel
  • New prefabricated MV substation
  • Electrical studies (load flow, short-circuit, selectivity, etc.)
  • New fire-fighting system
  • DCS control logic
Activities
Construction engineering for the refurbishment of the primary HV/MV substation (TRA transformer bay).

Object
Tavazzano Power Plant – engineering for the 132 kV and 6 kV areas and related systems listed above.