ΛΤs Aree Tecniche Srl menu
Home > Projects > Definitive-Executive Engineering BESS Plants

STORAGE systems (BESS)

Activity details

Definitive project:

Performed the following activities:

  • Determination of necessary land and areas (pre-analysis)
  • Landscape impact assessments
  • Specialist analyses (geological, hydrogeological, etc.)
  • DPA (first approximation distances) power lines connection
  • Plant layout
  • Final/executive project (system and connection works)
  • Authorization Procedures Management (Permitting Manager)

Activities
DEFINITIVE/EXECUTIVE Engineering Activity STORAGE Systems (BESS). Permitting/Definitive Design/Executive Design Activity Definitive Project

Subject
BESS Systems (Battery Energy Storage System)
Total power under authorization: 10+6+40MW (224MWh)