Energy Storage (BESS) Plants

Scope of work

Definitive Design:

Activities performed:

  • Identification of land and required areas (pre-analysis)
  • Landscape impact assessments
  • Specialist studies (geology, hydrogeology, etc.)
  • Preliminary clearance distances (DPA) for connection overhead lines
  • Plant layout definition
  • Definitive/executive design (plant and grid connection works)
  • Authorization procedures management (Permitting Manager)
Activities
DEFINITIVE / EXECUTIVE engineering for STORAGE (BESS) plants. Permitting, Definitive Design and Executive Design.

Object
Definitive Design of BESS (Battery Energy Storage System) plants
Total capacity under authorization: 10 + 6 + 40 MW (224 MWh)

BESS plant layout – sample 1 BESS plant layout – sample 2