Scope of work

PORTO TORRES PLANT – DESIGN OF REFURBISHMENT / REVAMPING OF MV/LV SUBSTATIONS

The project documentation was developed to define all system characteristics and performance and to detail every activity required to carry out the revamping of Primary Substation 116064 at the Porto Torres site.

The new electrical system included the following switchboards:

  • QD6 – 6 kV MV switchboard
  • QPC1 – 400 V Power Center switchboard
  • QSA – 400/230 V Auxiliary Services switchboard
  • QK – 110 Vdc Battery Charger switchboard
  • QSDA – Automatic Transfer Control switchboard
  • QFO – Optical Fiber switchboard
  • QKI – UPS switchboard
  • QL – Substation Lighting/Small Power switchboard
  • QRA – Power Factor Correction, QPC1 Busbar A
  • QRB – Power Factor Correction, QPC1 Busbar B

A key aspect of the design was the definition of the high-speed Automatic Transfer System (ATS-HS), ensuring service continuity depending on fault type and the 6 kV MV network configuration. For all MV and LV protections, a redundant Ethernet network via optical fiber was adopted using IEC 61850 protocol.

Activities
Engineering for MV/LV substation refurbishment, including fast transfer (ATS-HS) logic upgrades, network fault dynamic analyses, load flow, protection settings and selectivity studies.

Object
  • Refurbishment of “Acqua Mare” substation no. 116062
  • Refurbishment of “Ex Fenoli” substation no. 116064
  • Replacement of MV, LV, MCC and auxiliary services switchboards, and introduction of automatic load control via fiber-optic data network using IEC 61850 communication protocols
Total engineering hours: 3,000

MV/LV substation refurbishment – Porto Torres