Electric System for Gas Plant of Capparuccia

Activity details

C.LE GAS DI CAPPARUCCIA: ELECTRICAL SYSTEM WITH MT INPUT, MT/BT TRANSFORMER, PC, MCC, FACTOR CORRECTION, CONDUCTED CATHODIC PROTECTION

The development of the Capparuccia field in which all the process and service facilities (electrical, instrumental, etc.) were designed, saw the sizing of the entire electrical system of the gas station, foreseeing:

  • MV delivery section (20KV) from the distribution body;
  • MV/LV transformation section (20/0.4-0.23KV);
  • radial type LV distribution section (0.4-0.23KV) to the system users;
  • emergency section with a diesel generator to assist in the event of a power failure;
  • preferential power supply section (UPS) dedicated to the control devices;
  • safety services rescue section (110Vcc RESCUE).
Activities
Basic engineering verification, detailed engineering, technical alignment of supplier offers, verification of supplier technical documentation, testing at suppliers' premises, assistance with installation and start-up of the system.

Subject
  • Electrical system with MT input, MV/LV transformer, PC, MCC, power factor correction, conducted cathodic protection

Total hours: 6'000