Capparuccia Gas Plant – Electrical System

Scope of work

GAS PLANT ELECTRICAL SYSTEM – MV SUPPLY, TRANSFORMER, POWER CENTER, MCC, POWER FACTOR CORRECTION, PIPELINE CATHODIC PROTECTION

The development of the Capparuccia field, where all process and service facilities (electrical, instrumentation, etc.) were designed, included the complete sizing of the gas plant electrical system, comprising:

  • MV (20 kV) incoming section from the distribution utility;
  • MV/LV transformer section (20/0.4–0.23 kV);
  • LV (0.4–0.23 kV) radial distribution to plant utilities;
  • Emergency section with diesel generator for backup power;
  • UPS section dedicated to control systems;
  • Safety services backup (110 Vdc emergency supply).
Activities
Basic and detailed engineering review, supplier technical offer evaluation, vendor documentation verification, factory acceptance tests (FAT), and assistance during installation and commissioning.

Object
  • Electrical system including MV incoming supply, MV/LV transformer, Power Center, MCC, power factor correction, and pipeline cathodic protection.

Total engineering hours: 6,000