ΛΤs Aree Tecniche Srl menu
Home > Projects > HVAC System for Production Buildings

HVAC System for Production Buildings

Scope of work

HVAC DESIGN FOR PRODUCTION FACILITIES

The design documentation was developed to define:

  • System sizing;
  • All construction features of the air-handling units;
  • All installation details;
  • All HVAC control and regulation functions.

All quality-control and FAT phases during procurement were also planned. The engineering development leveraged 3D tools to complete BIM-based documentation.

Activities
Construction engineering for HVAC systems serving production buildings.

Object
HVAC design for process-plant buildings. The system mainly includes:
  • Power, control and regulation panels for HVAC systems;
  • Supply and exhaust ventilation systems (SF, EF);
  • Heating & ventilation units (HVU).

Total engineering hours: 3,000


HVAC system – layout detail HVAC system – equipment views