ΛΤs Aree Tecniche Srl menu
Home > Projects > LV Switchgear Revamp – Gas Plant Ravenna

LV Switchgear Revamp – Gas Plant Ravenna (RA)

Scope of work

REVAMPING DESIGN FOR LV SWITCHGEAR

The design package was developed to define all features and performance of the system and to detail every activity required to carry out the revamp of the LV switchgear at the Rubicone Gas Plant. The work was executed without requiring a shutdown of production facilities.

Activities
Construction engineering for switchgear revamping.

Object
Rubicone Gas Plant – Electrical Room Revamp. Main systems:
  • Withdrawable PMCC switchboard;
  • Auxiliary services distribution board;
  • Lighting / small power (FM) board;
  • Power factor correction board.

Total engineering hours: 1,500


LV switchgear revamp – Ravenna