Activity details
BY-PASS AT 132KV SUBSTATION AT FALCONARA (AN) POWER PLANT
The intervention carried out concerns a modification of the SSE configuration with the insertion of a
Bypass in order to be able to carry out maintenance work on the 132KV substation (SSE).
The new switch (PASS – ABB), is connected to the input side, a cable line derived from the energy
delivery point. On the output side of the switch instead, the line that will connect to transformer
2 (AT/MT) is derived, thus allowing maintenance in continuity of operation.
The planned works included:
- Construction of reinforced concrete works;
- Construction of cable routes inside the substation;
- Laying of high voltage cables from the delivery point to the switch and from the switch to the
transformer supply point;
- Laying of SF6 insulated high voltage switch;
- Construction (modification) of earthing system;
- Construction of a high voltage switch command and control system;
Activities
Detailed engineering activities , PLC programming and assistance with plant
installation and start-up activities
Subject
- Replacing obsolete control systems with new generation systems
- Insertion of new parts of the production and/or product finishing and GAS storage
plant in ON and OFF SHORE PLANTS.
Relevant works:
- By-pass AT Substation AT 132KV Falconara (AN) Power Plant
Total hours: 32,000