ΛΤs Aree Tecniche Srl menu
Home > Projects > Platform Photovoltaic System

Platform Photovoltaic System

Scope of work

BONACCIA NW PLATFORM – OFF-GRID PV SYSTEM

The designed system meets the energy demand of the Bonaccia NW offshore platform through a plant configuration including a photovoltaic generation park, a battery storage section, and a main power distribution network.

Activities
Construction engineering for offshore PV system.

Object
Bonaccia NW Platform – Photovoltaic System. The installation mainly includes the following subsystems:
  • 600 V DC – 50 kW PV array;
  • PV control panel with battery charger (PV and/or generator input);
  • 110 V and 24 V power distribution;
  • Battery storage – Ni-Cd 9,600 Ah @ 48 V;
  • ATEX Ex-e Ni-Cd battery bank – 305 Ah @ 110 V.

Total engineering hours: 4,000


Bonaccia NW Platform PV System